Tuesday, July 10, 2007
Neat vs Messy
The labyrinth project has slowed much since the thermometer has caught our full attention the past week, but today with some thunderstorms, the mercury has peaked at 99F, so Bro. Juniper has called for volunteers for this evening, so far only Bro. Simon, myself, and Bro. Clarence (but he conditioned his service if Bro. Sedwick will also pitch in). We shall see. I would say the labyrinth is perhaps 60% complete, but I'm not holding my breath, for Bro. Juniper has been doing some experiments, instead of placing the stones atop the desert floor, I saw him digging a shallow test trench and placing stones so that they are flush with the desert floor. As the stones are placed now, he thinks the blowing sand will build up on one side or the other, but with the stones set into the ground, this would not be a problem. I must admit, I never considered it a problem, for I think that the drifting sand only adds interest to the labyrinth, and further, that the constantly shifting winds will keep the labyrinth a perpetual work in progress, just as sand dunes are constantly in motion and never appear the same. Well, maybe this evening I can present my feelings on this matter, for I think Bro. Simon will agree with me, but I fear Bro. Sedwick will side with "neatness" as I fear Bro. Clarence will too. Perhaps I could talk Bro. Charles into joining us, normally he keeps to the library, but neatness isn't one of his strong suits, so a sandy and "messy" labyrinth may be to his liking, and also one more vote against the neat camp.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment